Skip to content
L2Aurelia

Tessera Rollup

Fictional optimistic rollup that publishes a public engineering roadmap and monthly progress notes.

Last verified update 11 Sept 2026 (2 days ago)Data last checked today
Confidence Medium · data 100%
Compare
Share on X
Embed Ship Score badge
Tessera Rollup Ship Score badge
[![Ship Score](https://shiptrace.vercel.app/badge/tessera-rollup.svg)](https://shiptrace.vercel.app/projects/tessera-rollup)

Paste into a README or docs page. The badge updates automatically and links back here.

Ship Score

Score breakdown

Ship Score · formula v1.0.0

80–100 · Consistent documented delivery

This score measures documented delivery, not investment quality.

Confidence Medium · data 100%Calculated 13 Sept 2026 03:00 UTC
Milestone delivery × 0.40
82

Importance-weighted credit for approved milestones whose deadlines have passed.

Development continuity × 0.20
88

Release/tag cadence and weekly activity continuity from public repositories; not raw commit counts.

Product availability × 0.15
98

Rolling success rate of timestamped checks against explicitly listed product endpoints.

Transparency × 0.15
90

Dated roadmap updates, published explanations, accessible documentation and change disclosure.

Evidence quality × 0.10
78

Hierarchy-weighted quality and completeness of accepted evidence.

Show exact calculation
  1. Formula v1.0.0: delivery × 0.4 + development × 0.2 + availability × 0.15 + transparency × 0.15 + evidence × 0.1.
  2. Delivery: 3 approved past-deadline milestone(s) counted (importance weights core 3, major 2, minor 1); 0 disputed excluded; 0 cancelled-with-explanation shown separately; 1 awaiting review.
  3. • Fraud-proof system on public testnet: Shipped after deadline → credit 70 × weight 3
  4. • Public block explorer: Shipped on time → credit 100 × weight 1
  5. • Bridge UI redesign: Shipped on time → credit 100 × weight 1
  6. • Fee reduction upgrade: Awaiting review; not yet counted
  7. Delivery component = 82.
  8. Development continuity = 88 (active weeks, releases/tags in 90d, last push recency).
  9. Product availability = 98 (rolling success rate across approved endpoints, last 30 checks each).
  10. Transparency = 90 (dated roadmap updates, explanations, public docs, change disclosure).
  11. Evidence quality = 78 (hierarchy-weighted, completeness-adjusted).
  12. Total = 86.

Read the full methodology. Snapshots are stored with raw component values and are never rewritten.

Score history

6 stored snapshots

Stored snapshots with their formula version. Gaps mark periods with insufficient data. Historical snapshots are never rewritten.
Ship Score snapshots
DateTotalFormula
16 Apr 2026Insufficient datav0.9.0
16 May 2026Insufficient datav0.9.0
15 Jun 2026Insufficient datav1.0.0
15 Jul 2026Insufficient datav1.0.0
14 Aug 202685v1.0.0
13 Sept 202686v1.0.0

Roadmap

Timeline of milestones

6 commitments recorded from cited public sources, ordered by deadline.

  1. Public block explorer

    deadline 26 May 2026 · 4 months ago · delivered 24 May 2026

    Shipped
  2. Fraud-proof system on public testnet

    deadline 15 Jun 2026 · 3 months ago · delivered 25 Jun 2026

    Shipped
  3. Bridge UI redesign

    deadline 30 Jul 2026 · 46 days ago · delivered 25 Jul 2026

    Shipped
  4. Fee reduction upgrade

    deadline 24 Aug 2026 · 21 days ago

    Submitted for review
  5. Today · 13 Sept 2026
  6. Data availability layer integration

    deadline 18 Sept 2026 · in 4 days

    In progress
  7. Sequencer decentralization phase 1

    deadline 23 Oct 2026 · in 39 days

    Delayed

Open commitments

Upcoming commitments

Deadlines that have not passed. Community evidence can be submitted at any time.

In progressMajor milestone

Data availability layer integration

Commitment (paraphrase) · Post batch data to the external data availability layer on mainnet.

Evidence room
Claimed
25 Jun 2026
Deadline
18 Sept 2026 (in 4 days)
Delivered
Evidence
1 accepted
Status history (2)
  1. Created →PlannedModerator conclusion

    Commitment recorded from cited source (Tessera Rollup roadmap), accessed 2026-06-25.

    Mara Okafor · 26 Jun 2026 09:00 UTC · audit ST-74160BFC

  2. PlannedIn progressModerator conclusion

    Project published a dated progress update.

    Mara Okafor · 8 Sept 2026 14:00 UTC · audit ST-74160BFD · 1 evidence ref

DelayedCore milestone

Sequencer decentralization phase 1

Commitment (paraphrase) · Move sequencing to a permissioned set of at least five independent operators.

Evidence room
Claimed
18 Oct 2025
Deadline
23 Oct 2026 (in 39 days)
originally 16 Apr 2026
Delivered
Evidence
1 accepted

Moderator note · Deadline moved with a published explanation citing operator onboarding; tracked against the new date.

Status history (3)
  1. Created →PlannedModerator conclusion

    Commitment recorded from cited source (Tessera Rollup roadmap), accessed 2025-10-18.

    Mara Okafor · 19 Oct 2025 09:00 UTC · audit ST-2E311300

  2. In progressDelayedModerator conclusion

    Deadline passed; project published an updated timeline (new deadline 2026-10-23).

    Mara Okafor · 17 Apr 2026 23:00 UTC · audit ST-2E311302 · 1 evidence ref

  3. PlannedIn progressModerator conclusion

    Project published a dated progress update.

    Mara Okafor · 21 Apr 2026 16:00 UTC · audit ST-2E311301

Verified from public evidence

Shipped items

3 milestones verified as shipped or partially shipped.

ShippedMinor milestone

Public block explorer

Commitment (paraphrase) · Launch a public block explorer for the rollup with transaction search.

Evidence room
Claimed
25 Feb 2026
Deadline
26 May 2026 (4 months ago)
Delivered
24 May 2026
Evidence
1 accepted
  • Explorer liveTier 1 · Working product / release + docsVerified from public evidence
Status history (4)
  1. Created →PlannedModerator conclusion

    Commitment recorded from cited source (Tessera Rollup roadmap), accessed 2026-02-25.

    Mara Okafor · 26 Feb 2026 09:00 UTC · audit ST-2CCE8A1F

  2. PlannedIn progressModerator conclusion

    Project published a dated progress update.

    Mara Okafor · 11 Apr 2026 16:00 UTC · audit ST-2CCE8A20

  3. In progressSubmitted for reviewAutomated observation

    Evidence submitted for review.

    SHIPTRACE automated intake · 23 May 2026 15:00 UTC · audit ST-2CCE8A21

  4. Submitted for reviewShippedModerator conclusion

    Verified from public evidence: primary source matches the commitment scope.

    Mara Okafor · 24 May 2026 15:00 UTC · audit ST-2CCE8A22 · 1 evidence ref

ShippedCore milestone

Fraud-proof system on public testnet

Commitment (paraphrase) · Deploy the interactive fraud-proof system to the public testnet with documentation for challengers.

Evidence room
Claimed
7 Dec 2025
Deadline
15 Jun 2026 (3 months ago)
Delivered
25 Jun 2026
Evidence
2 accepted
Status history (4)
  1. Created →PlannedModerator conclusion

    Commitment recorded from cited source (Tessera Rollup roadmap), accessed 2025-12-07.

    Mara Okafor · 8 Dec 2025 09:00 UTC · audit ST-AF8C4A24

  2. PlannedIn progressModerator conclusion

    Project published a dated progress update.

    Mara Okafor · 12 Mar 2026 16:00 UTC · audit ST-AF8C4A25

  3. In progressSubmitted for reviewAutomated observation

    Evidence submitted for review.

    SHIPTRACE automated intake · 24 Jun 2026 15:00 UTC · audit ST-AF8C4A26

  4. Submitted for reviewShippedModerator conclusion

    Verified from public evidence: primary source matches the commitment scope.

    Mara Okafor · 25 Jun 2026 15:00 UTC · audit ST-AF8C4A27 · 2 evidence refs

ShippedMinor milestone

Bridge UI redesign

Commitment (paraphrase) · Release a redesigned bridge interface with transaction status tracking.

Evidence room
Claimed
16 May 2026
Deadline
30 Jul 2026 (46 days ago)
Delivered
25 Jul 2026
Evidence
1 accepted
Status history (4)
  1. Created →PlannedModerator conclusion

    Commitment recorded from cited source (Tessera Rollup roadmap), accessed 2026-05-16.

    Mara Okafor · 17 May 2026 09:00 UTC · audit ST-3AC423FE

  2. PlannedIn progressModerator conclusion

    Project published a dated progress update.

    Mara Okafor · 23 Jun 2026 04:00 UTC · audit ST-3AC423FF

  3. In progressSubmitted for reviewAutomated observation

    Evidence submitted for review.

    SHIPTRACE automated intake · 24 Jul 2026 15:00 UTC · audit ST-3AC42400

  4. Submitted for reviewShippedModerator conclusion

    Verified from public evidence: primary source matches the commitment scope.

    Mara Okafor · 25 Jul 2026 15:00 UTC · audit ST-3AC42401 · 1 evidence ref

Neutral record

Delayed, no-evidence, disputed and cancelled items

A missed deadline or missing evidence is recorded as such. It is not a conclusion about the project's intent.

DelayedCore milestone

Sequencer decentralization phase 1

Commitment (paraphrase) · Move sequencing to a permissioned set of at least five independent operators.

Evidence room
Claimed
18 Oct 2025
Deadline
23 Oct 2026 (in 39 days)
originally 16 Apr 2026
Delivered
Evidence
1 accepted

Moderator note · Deadline moved with a published explanation citing operator onboarding; tracked against the new date.

Status history (3)
  1. Created →PlannedModerator conclusion

    Commitment recorded from cited source (Tessera Rollup roadmap), accessed 2025-10-18.

    Mara Okafor · 19 Oct 2025 09:00 UTC · audit ST-2E311300

  2. In progressDelayedModerator conclusion

    Deadline passed; project published an updated timeline (new deadline 2026-10-23).

    Mara Okafor · 17 Apr 2026 23:00 UTC · audit ST-2E311302 · 1 evidence ref

  3. PlannedIn progressModerator conclusion

    Project published a dated progress update.

    Mara Okafor · 21 Apr 2026 16:00 UTC · audit ST-2E311301

Automated observation

Development pulse

Active weeks (of 12)
9
Releases / tags (90d)
2 / 2
Latest release
v0.9.2
Last push
5 days ago
Default branch
main
Retrieved
13 Sept 2026 06:00 UTC

Repository activity is an observation, not proof of delivery. Commit counts alone never verify a milestone.

Automated observation

Product status

One failed check never proves abandonment. Availability uses a rolling window with neutral labels.

Sources

Evidence feed

Accepted evidence is verified; pending community submissions are visibly unverified until a moderator decides.

Submit evidence
Verified from public evidenceTier 3 · Official documentation / announcementModerator

DA integration status

Dated progress note: integration live on testnet, mainnet activation scheduled.

Submitted by
Mara Okafor
Review
9 Sept 2026 16:00 UTC
Community
2 support 0 challenge

Moderator conclusion · Source is a public, dated record matching the commitment scope.

Audit record ST-BF9F746A · database identifier, not a blockchain claim

Clarification requested · unverifiedTier 5 · Community observationCommunity submission

Screenshot of lower fees

A screenshot without a source URL showing lower fees in a wallet.

Submitted by
Aiko Tanaka
Review
29 Aug 2026 16:00 UTC
Community
0 support 0 challenge

Moderator conclusion · Screenshots without a source URL are weak evidence. Please link the dashboard or block data.

Audit record ST-24840B7A · database identifier, not a blockchain claim

Verified from public evidenceTier 1 · Working product / release + docsModerator

New bridge interface live

Redesigned bridge reachable at the documented URL with status tracking.

Submitted by
Mara Okafor
Review
27 Jul 2026 16:00 UTC
Community
2 support 0 challenge

Moderator conclusion · Source is a public, dated record matching the commitment scope.

Audit record ST-7AA10FAC · database identifier, not a blockchain claim

Verified from public evidenceTier 4 · Independent reportingModerator

Independent write-up of testnet fraud proofs

Third-party engineering blog reproduces a challenge on the public testnet.

Submitted by
Mara Okafor
Review
2 Jul 2026 16:00 UTC
Community
2 support 0 challenge

Moderator conclusion · Source is a public, dated record matching the commitment scope.

Audit record ST-7A09CD13 · database identifier, not a blockchain claim

Verified from public evidenceTier 2 · Repository release / tagCommunity submission

tessera-rollup v0.9.0 (fraud proofs)

Release includes challenger CLI and testnet deployment addresses.

Submitted by
Tomasz Rivera
Review
27 Jun 2026 16:00 UTC
Community
2 support 0 challenge

Moderator conclusion · Source is a public, dated record matching the commitment scope.

Audit record ST-7A09CD12 · database identifier, not a blockchain claim

Verified from public evidenceTier 1 · Working product / release + docsModerator

Explorer live

Explorer reachable at the documented URL with transaction search.

Submitted by
Mara Okafor
Review
26 May 2026 16:00 UTC
Community
2 support 0 challenge

Moderator conclusion · Source is a public, dated record matching the commitment scope.

Audit record ST-E985004D · database identifier, not a blockchain claim

Verified from public evidenceTier 3 · Official documentation / announcementModerator

Sequencer timeline update

Dated post explaining the slip and committing to a new date.

Submitted by
Mara Okafor
Review
28 Apr 2026 16:00 UTC
Community
2 support 0 challenge

Moderator conclusion · Source is a public, dated record matching the commitment scope.

Audit record ST-81B64EEE · database identifier, not a blockchain claim

Audit trail

Change log

Every verified status change, new commitment, deadline change and accepted evidence for this project.

  1. Evidence added
  2. Evidence added
  3. Shipped
  4. Evidence added
  5. Evidence added
  6. New commitment
  7. Shipped
  8. New commitment
  9. Evidence added
  10. Shipped
  11. New commitment
  12. Evidence added
  13. Deadline changed
  14. Delayed
  15. New commitment
  16. New commitment
  17. New commitment

Corrections

Methodology and correction process

Statuses are set only by moderators, with a written reason and evidence references, following the published methodology. Automated checks create observations, never conclusions.

Project claims, community submissions, automated observations and moderator conclusions are labelled separately throughout this page.

Believe something here is wrong? Anyone — including project representatives — can request a correction. Prior decisions remain in the audit history.

Shipped Partially shipped Delayed No evidence Disputed Cancelled